Solid workout and well done for persevering to remove as much of the wall frames as possible! 💪
The Plastic Shed refurb of 2026 has kicked off this week, with the previous shelving space used by Shuropody needing to be dismantled and removed to install murals, actual shelving, and other arty paraphernalia.
With a wide array of screwdrivers 🪛 drills, GoodGym elbow grease, and a handy crowbar, we managed to remove as much as possible, with some clinging on as a future problem. At times it felt like a rage room, with banging and drilling filling the air along with the resulting dust.
With the health and safety book firmly out of reach, the Treatment Room 2 upstairs is now filled with wall panels, wood planks (some with screws still attached...), and after some scraping and sanding from Sophie, Caitlin seemed happy with the progress made.
Top effort and teamwork from Hazel, Mandy, Fanette, Tanoshi, Sophie, and Ben!